Project Value/Cost
Value: N$ 350,000
Client Name
GIZ Namibia
Project Year
2023
Client Contact Details
Mr. Johnnes
081 657 8000
Project Description
- Supply, delivery, and installation of a 5 kW off-grid solar PV system at Shima Primary School in Opuwo, Kunene Region
- The project aims to provide reliable and sustainable energy to the school, enabling better educational facilities and opportunities
Expected Deliverables
Design and Planning
- Detailed design and layout of the 5 kW off-grid solar PV system
- Site assessment and feasibility studies
- Electrical system design for efficient energy storage and distribution.
Procurement
- Sourcing of high-quality PV modules, batteries, inverters, and mounting structures
- Procurement of balance of system components such as wiring, connectors, and safety equipment/li>
Delivery
- Safe and timely delivery of all system components to Shima Primary School.
- Coordination of logistics to ensure all materials arrive on-site as scheduled.
Installation
- Professional installation of PV modules and mounting structures.
- Installation of inverters, batteries, and other electrical components.
- Ensuring proper alignment and connection of all system parts.
Commissioning and Testing
- Comprehensive testing of the installed system to ensure optimal performance.
- Verification of battery storage and energy management systems.
- Performance verification and quality assurance.
Training and Handover
- Training for the school’s personnel on system operation and maintenance.
- Detailed documentation and manuals for the installed system.
- Final handover of the fully operational solar PV system.
Maintenance and Support
- Scheduled maintenance visits to ensure system longevity and performance.
- Technical support and troubleshooting for the client.
- Performance monitoring and reporting.
Environmental Impact Report
- Assessment of the environmental benefits of the solar PV system.
- Calculation of the reduction in carbon footprint and energy savings.
Warranty and Guarantees
- Warranty on PV modules, inverters, and installation workmanship.
- Performance guarantees to ensure energy output meets expectations.
Regulatory Compliance
- Ensuring all installations comply with local and international standards.
- Assistance with obtaining necessary permits and approvals.
This comprehensive approach ensures the successful delivery and long-term sustainability of the 5 kW off-grid solar system at Shima Primary School,providing significant environmental and educational benefit. ➺
This comprehensive approach ensures the successful delivery and long-term sustainability of the 5 kW off-grid solar system at Shima Primary School,providing significant environmental and educational benefit. ➺
This comprehensive approach ensures the successful delivery and long-term sustainability of the 5 kW off-grid solar system at Shima Primary School,providing significant environmental and educational benefit. ➺
This comprehensive approach ensures the successful delivery and long-term sustainability of the 5 kW off-grid solar system at Shima Primary School,providing significant environmental and educational benefit. ➺
This comprehensive approach ensures the successful delivery and long-term sustainability of the 5 kW off-grid solar system at Shima Primary School,providing significant environmental and educational benefit. ➺
This comprehensive approach ensures the successful delivery and long-term sustainability of the 5 kW off-grid solar system at Shima Primary School,providing significant environmental and educational benefit. ➺
This comprehensive approach ensures the successful delivery and long-term sustainability of the 5 kW off-grid solar system at Shima Primary School,providing significant environmental and educational benefit. ➺
This comprehensive approach ensures the successful delivery and long-term sustainability of the 5 kW off-grid solar system at Shima Primary School,providing significant environmental and educational benefit. ➺